Skip to content

HomeProjects

EnergyBAS-U

New pellet boiler for Göteborg Energi and Mölndal Energi

When many parties work in parallel and the risks keep changing, a project needs presence, structure and clear coordination. As BAS-U, the Swedish construction-phase safety coordinator, WermKon is on site through every phase of the project. We drive health and safety management in close contact with both the client and the contractors.

Client
Göteborg Energi & Mölndal Energi
Sector
Energy
Our role
BAS-U
Location
Mölndal
Period
May 2024 – March 2027
On-site lead
Lena Jonsson
The crane's hook block during construction of the pellet boiler in Mölndal

The assignment

How we coordinate health and safety management during construction of Göteborg Energi's new pellet boiler

At Mölndal Energi, construction is under way on a new pellet boiler that will contribute to district heating production. The project is an important part of strengthening and future-proofing the energy supply. It will also increase the share of renewable energy in the district heating system.

Göteborg Energi owns the pellet boiler, and Mölndal Energi will operate it once it is complete. The project organisation began the delivery phase in May 2024 and plans to complete the project in March 2027.

WermKon is involved in the project as BAS-U on behalf of Göteborg Energi and Mölndal Energi. We are responsible for coordinating and following up health and safety management during the construction phase. We work to ensure a safe, well-planned and efficient working environment throughout the project.

The challenge

The risks change through each phase of the project

In energy projects of this size, both the health and safety challenges and the risks change as the project develops.

Phase 1

In the early stage of the project, the focus was on groundworks such as tree felling, excavation, work with explosives and site set-up. These activities demanded close coordination between contractors, safe handling of construction machinery and clear health and safety planning.

Phase 2

When the project moved on to assembly, installation and heavy lifts, new risks arose from work at height, hot work, crane lifts and the installation of pipes, cables and other equipment. At the same time, several contractors were working in parallel in a limited area. This demanded close coordination, clear communication and control over all ongoing work.

Phase 3

As the project nears commissioning, the main risks come from pressure testing, start-up and the safe isolation of systems and equipment.

WermKon's role is to keep health and safety management coordinated throughout the project and make sure safety is maintained through every phase. We are present as BAS-U and work closely with both the client and the contractors to create structure, clarity and confidence on site.

The solution

Presence and coordination throughout the project

For health and safety management to work in practice on large energy projects, you need daily presence and continuous coordination. WermKon works closely with the project every day and follows up on people, work activities and potential risks on site.

Among other things, we do this by:

  • Holding daily coordination meetings
  • Carrying out regular walk-rounds on site
  • Carrying out weekly safety inspections
  • Following up permits to work
  • Checking hot work
  • Keeping track of who is in the area
  • Coordinating the project with existing operations
  • Documenting and following up continuously

An important part of our work is keeping the same high standard throughout the project. We make sure safety work never loses momentum, even as the project nears its final stage. As the project enters new stages, we continually adapt health and safety management to the risks identified in the current phase.

Heavy lifts are one example, and here presence is especially important. When cranes, materials and people share the same area, everyone must know where they are allowed to be and how the lifts will be carried out. Coordination and a clear presence are key to safety on site.

The results

Safety management that works day to day

Through clear structure, daily presence and close cooperation with the client, WermKon creates better conditions for safe delivery on this project. Here, health and safety management becomes a natural part of the project's daily routine. This means risks are picked up in time, responsibilities are clearer and communication between the different parties works better.

Through clear structure, daily presence and close cooperation with the client, WermKon creates better conditions for safe delivery. Health and safety management becomes a natural part of the project's daily routine. This allows the team to deal with risks in time, clarify responsibilities and build better collaboration between everyone on site.

Worth SEK 15,000Free of charge to you

Get a free needs assessment of your site.

We visit your workplace, review risks and working methods, and recommend the roles and skills you need on site.

Book a needs assessment

How it works

  1. 01You send us your details.
  2. 02We contact you and book a visit to your site.
  3. 03We review risks and working methods and recommend roles and skills.